KitLog pro

Powered By Kitlog Pro v2.0

Buds Web Site
' style=
Date:  9-5-2010
Number of Hours:  5.30
Manual Reference:  25-05
Brief Description:  Aft Window

After the Match Drilling of the #40 through the Aft Window and into the roll bar I riveted the fwd turtle deck skins to the fuselage and tailcone. I then removed the clecoes holding the aft window, and then lifted the aft window to a table and opened up the holes with a #27 drill bit suitiable for plastics.
The next task was to final-drill #36 all of the previously #40 drilled roll bar. The Roll bar holes will need tapping to hold the round headed screws.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.